Major Projects

 

MAJOR PROJECT REFERENCE ( YEAR 2006 )

PROJECT DESCRIPTIONS

CLIENTS

INSTALLATION OF FUMEHOOD, EXHAUST DUCTING, EXHAUST FAN & FRP TANKS FOR RUBBER GLOVE PRODUCTS

RUBBER GLOVE MANUFACTURER

CHEMICAL DELIVERY SYSTEM FOR WAFER FAB DOUBLE CONTAINMENT PIPING PFA/PVC CLEAR

SEMI-CONDUCTOR

AFTER PROCESS MACHINERY EQUIPMENT FOR RUBBER GLOVE PRODUCT

RUBBER GLOVE MANUFACTURER

PROCESS UTILITIES PIPING FOR CENTRALIZED CHEMICAL STORE YARD PVC SCH 80, FRP TANKS

SEMI-CONDUCTOR

INSTALLATION OF SCRUBBER SYSTEM (2,000 CFM) & FRP EXHAUST SYSTEM TO REL & FA LAB

SEMI-CONDUCTOR

 

MAJOR PROJECT REFERENCE ( YEAR 2005 )

PROJECT DESCRIPTIONS

CLIENTS

AFTER PROCESS MACHINERY EQUIPMENT FOR RUBBER GLOVE PRODUCT

RUBBER GLOVE

MODIFICATION OF EXISTING PLATING LINE MACHINERY EQUIPMENT C/W PROCESS & UTILITIES PIPING & TANKS

SEMI-CONDUCTOR

CHEMICAL DELIVERY SYSTEM FOR WAFER FAB DOUBLE CONTAINMENT PIPING PFA/PVC CLEAR

SEMI-CONDUCTOR

 

MAJOR PROJECT REFERENCE ( YEAR 2004 )

PROJECT DESCRIPTIONS

CLIENTS

INSTALLATION OF SCRUBBER SYSTEM ( 17500 CFM ) & FRP EXHAUST SYSTEM TO PRODUCTION

SEMI-CONDUCTOR

PVC SCH 80 DRAINAGE PIPING, CONSTRUCTION OF DOUBLE CONTAINMENT FRP / CONCRETE SUMP & TRENCH

SEMI-CONDUCTOR

FIRE-RETARDANT FRP EXHAUST DUCTING FOR TIN DIP & DEFLASH MACHINE RELOCATION

SEMI-CONDUCTOR

TO SUPPLY & INSTALL EXHAUST AND UTILITY PIPING FOR PLATING MACHINE ( TESTING AND COMMISIONNING )

SEMI-CONDUCTOR

 

MAJOR PROJECT REFERENCE ( YEAR 2003 )

PROJECT DESCRIPTIONS

CLIENTS

PRIMARY DI WATER – PVC SCH 80 PIPING

SEMI-CONDUCTOR

EXHAUST FAN UPGRADING & PVC DUCTING WORKS

SEMI-CONDUCTOR

EXHAUST DUCTING, DRAINAGE PIPE WORKS, PVC VACUUM PIPE & TEFLON TUBING

SEMI-CONDUCTOR

FRP SQUARE TANK

OIL & GAS

FRP STILLING PLATE FOR PULSATOR SYSTEM

TREATMENT PLANT

FRP LINNING OF CYANIDE DESTRUCTION TANK, DRAINAGE & OVERFLOW Ø 6” PVC PIPING

SEMI-CONDUCTOR

 

MAJOR PROJECT REFERENCE ( YEAR 2002 )

PROJECT DESCRIPTIONS

CLIENTS

PVC SCRUBBER C/W EXHAUST DUCTING SYSTEM

SEMI-CONDUCTOR

DESIGN, SUPPLY, INSTALL & SUBMISSION CHLORINE EMERGENCY SCRUBBER SYSTEM

TREATMENT PLANT

PRIMARY DI WATER PIPES FROM DI PLANT TO PRODUCTION

SEMI-CONDUCTOR

SUPPLY AND FIX GALVANISED MILD STEEL GRATINGS AT TREATMENT PLANT

TREATMENT PLANT

SCRUBBER & EXHAUST SYSTEM, M/S PLATFORM, PVC SCH 80 PIPING & MACHINE SET-UP

RUBBER GLOVE

EPOXY FLOOR COATING

SEMI-CONDUCTOR

 

MAJOR PROJECT REFERENCE ( YEAR 2001 )

PROJECT DESCRIPTIONS

CLIENTS

3,000 CFM CYANIDE SCRUBBER SYSTEM C/W DUCTING, HOOD & MACHINE HOOK-UP

SEMI-CONDUCTOR

PVC SCH 80 DOUBLE CONTAINMENT DRAINAGE PIPING FOR PIPE SIZE Ø 6” / Ø 4” & Ø 4” / Ø 2”

SEMI-CONDUCTOR

3”, Ø 8” AND Ø 12” HDPE PIPING FROM OLD WWTP TO NEW BUILDING (TOTAL LENGTH: 300M), C/W – UNDERGROUND PIPE JACKING

SEMI-CONDUCTOR

PROCESS AND UTILITY PVC SCH 80 PIPING AND EXHAUST

M & E CONSTRUCTION COMPANY

TO SUPPLY AND INSTALL ACID WASTE PIPE, DI PVDF PIPE, AIR SCRUBBER FRP-FR DUCT

M & E CONSTRUCTION COMPANY

INSTALLATION OF HDPE PIPING OF SIZE: Ø 12”

CHEMICAL PLANT

CHEMICAL RESISTANT FRP FLOOR LINING AT WWTP

SEMI-CONDUCTOR

 

MAJOR PROJECT REFERENCE ( YEAR 2000 )

PROJECT DESCRIPTIONS

CLIENTS

TO SUPPLY AND INSTALL PVC PIPES IN TRENCH C/W BRACKETS FOR EFFLUENT DISCHARGE AND PRODUCTION MACHINE.
FRP LINING ON CHEMICAL WASTE DISCHARGE PIPE TRENCH AT PRODUCTION AREA & EXTERNAL PASSAGE WAY LEADING TO BASEMENT EFFLUENT TANK.

SEMI-CONDUCTOR

TO SUPPLY AND INSTALL REEL TO REEL PP PLATING TANK, SPARE-PARTS AND PP CHEMICAL STORAGE TANKS FOR REEL TO REAL PLATING MACHINE.

SEMI-CONDUCTOR

 

MAJOR PROJECT REFERENCE ( YEAR 1999 )

PROJECT DESCRIPTIONS

CLIENTS

FRP LINING ON CONCRETE SUMP, SUPPLY & INSTALL
FRP TANKS FOR DOUBLE COINTAIMENT.

SEMI-CONDUCTOR

Ø 1” & Ø 2” PVDF LINED FRP PIPING FOR HIGH CONCENTRATED H2SO4 ACID.

OIL & GAS

3,000 CFM VERTICAL SCRUBBER SYSTEM C/W EXHAUST FAN.

RUBBER GLOVE

PP TANK FOR REEL TO REEL PLATING MACHINE.

SEMI-CONDUCTOR

 

 
About Us :: Projects :: Products :: Services :: Contact Us
Copyright Westcare Plastic Engineering. All rights reserved.